Dry Riser Installation – East London

Firetech Dry Risers were contacted and awarded the Dry Riser package at this large regeneration project in East London. With over 70 Landing valves and 100 metres of feed spread over the systems. Working for a new client our engineers did a brilliant job working to high standards in a tight schedule. We have now completed Phase 1 with commissioning imminent. Our client also requested we installed temporary Inlet breaching valves on the perimeter of the site so the systems can be used in the event of an emergency whilst still under construction. We are due back on site early 2023 to commence Phase 2.