Matthew Street, Liverpool

Recently renovated into a luxury aparthotel this development required a Dry Riser system.

Due to the lack of space on the external of the building, it was agreed with building control that the inlet valve could be installed internally of the building entrance.

Well within the 18 metres of fire brigade access and with fluorescent signage installed above the door entrance. With Landing located on 3 Levels secured with padlock and straps.

You might also like

More Similar Posts